Bresic Whitney Offices, Sydney
INSTALLER: Concrete Artisans – www.concreteartisans.com.au
BUILDER: SPM – www.sherington.com.au
ARCHITECT: Chenchow Little Architects – www.chenchowlittle.com
PROJECT ADDRESS: 318 Liverpool St Darlinghurst
The original plan for the Bresic Whitney office in Surry Hills was to leave a 70mm set down to pour a topping slab and then polish this to create an industrial polished concrete look. In researching this method, time concerns surfaced, as the topping slab would take 4 – 5 weeks to dry before polishing. This was coupled with access & logistic concerns because of the location of the project. In researching this PANDOMO FloorPlus was introduced into the mix to alleviate concerns relating to drying times & installation.
Although PANDOMO FloorPlus and A 38 screed were not as cost effective as polishing a topping slab on paper, a proper cost comparison was prepared by Chenchow Little Architects. In this cost comparison they found that the rapid drying ability of the 65mm A 38 screed (Approximately 24 hours) as well as the 6mm PANDOMO FloorPlus (Also 24 hours) allowed the project to be completed in a far quicker time frame. This allowed the client to take occupation of the building far quicker than the original flooring specified to start generating an income.
An area which also needed addressing in the project was access, and PANDOMO addressed this by allowing the products which made up the system to be craned up to the 2nd level. Once up there, the system was installed in zones. This combined with the ability to walk on the newly poured floor after 3 hours allowed the project to flow without any distraction from the installation of the floor.
An additional feature of using the PANDOMO FloorPlus in the Bresic Whitney project was the ability to produce a high quality finish against composite flooring systems. In this situation the PANDOMO FloorPlus abutted timber flooring to produce a high quality finish throughout, something which is extremely difficult to achieve with a topping slab because of the excessive grinding required.
More projects in Flooring
-
WAI ARIKI HOT SPRINGS & SPA
Wai Ariki is a luxury spa and wellness centre based on the shores of Lake Rotorua.
-
Heathrow Airport
A 40,000m² flooring refurbishment of Heathrow Airport’s Terminal 1
-
Aotea Center
Crushed Italian Marble Used In Customised ARDEX PC-T Floor Installation
-
Air New Zealand Head Office
ARDEX Specifed For High End Remedial Project
-
SO/Auckland Hotel
SystemARDEX specified for a luxurious, high-end hotel complex
-
Fiji Marriott Resort Momi Bay
New Luxury Resort Receives the SystemARDEX Treatment
-
The British Museum, UK
ARDEX provide The British Museum with a floor built to withstand its ever increasing popularity
-
2014 Commonwealth Games Swimming Pool, Glasgow
Tollcross International Swimming Centre
-
Elevate Apartments, Wellington
-
MERCEDES BENZ AUTOHAUS, NEWSTEAD
ARDEX System Specified for Unique 32,000m² Auto Dealership
-
University of Canterbury – The Core, Christchurch
-
Westfield Miranda, Sydney
ARDEX specification chosen for project requiring quick turnaround
-
The Emporium, Melbourne
21,000 sqm of tiling completed using ARDEX adhesive and grout
-
Bresic Whitney Offices, Sydney
ARDEX screed and PANDOMO specified in time sensitive project
-
Government Building, 1 William Street, Brisbane
ARDEX binder and screed used to repair damage to high traffic area
-
Q1 Surfers Paradise, Brisbane
ARDEX tile adhesives, soundproofing requirements, grouts and floor leveling were used in this residential tower